A second phase for the electrical interconnection study in the Central American Isthmus
Formato: | Texto |
---|---|
Idioma: | Spanish / Castilian |
Publicado: |
CEPAL
1976-12
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/11362/26290 |
Ejemplares similares
-
Review of programme for Geothermal electric power development in the Central American Isthmus, 1975-1985
Publicado: (1975-10) -
Hourly cost of electricity supply in an interconnected system
por: Friedmann, Efraín, et al.
Publicado: (1961-04-21) -
Economic and technical aspects of the interconnection of electric power systems
Publicado: (1960-11-16) -
Technical support to electrical integration in the Central American Isthmus: regional cooperation project
Publicado: (1984-02-03) -
Istmo Centroamericano: marco de referencia de los proyectos del subsector eléctrico = Central American Isthmus: framework for projects of the electrical sub-sector
Publicado: (1989-06-07)